FLAKE ICE PLANT

  1. In this process the ice in the shape of Flakes will be formed using the ammonia gas and cooling tower fan. Through the cooling tower pump the water is supplied to the machines for the production of Ice and once the ice is formed the FIM cutter motor cuts the ice as per required thickness depending upon the customer. Every 30 min we can achieve around 500kg of ice.
  2. The above process operation has been done by Cabinet Systems in PLC & HMI SCREEN both in auto/manual operations as per system requirements.
  3. In Manual Mode The Operator Can Manually Start The Motor Individualy By Start/Stop Push Button That Is Provided In The Panel And the Hmi Screen.

TUBE ICE MAKER

  1. In This Process there are two cycles, one is freezing cycle and the other is Thawing cycle.
  2. Freezing cycle: In the freezing cycle ice will be formed by using ammonia gas. Using cooling tower fan, cooling tower pump the water is supplied to the tubes for the production of ice .
  3. Thawing cycle: In this cycle Because of Thawing Gas tube ice drops on the Tube ice maker Cutter then that cutter cuts that tube ice into pieces.
  4. The above process operation has been done by Cabinet Systems using PLC in auto/manual operations as per system requirements.
image
image

RLC (Rectangular link conveyor)

  1. In this process there is two cycle charging and discharging. Charging cycle: the ice formed will be stored in the ice container(capacity of ice storage will be depend on customer requirements).the ice will be levelled by using the rectangular link conveyor this operation will all the control are given both in auto/manual mode
  2. In Manual Mode The Operator Can Manually Start The Motor Individualy By Start/Stop Push Button That Is Provided In The Panel And HMI
  3. Discharge cycle: In this process all the ice are delivered using elevating and discharge screw conveyor. Here Ice Gate Winch Should Go Up Direction, After Getting The Up Feedback Discharge Screw Conveyor Starts And Rlc Move In Forward Direction And Lift Will Be Moving In Down Direction.